  1. Laboratory and analytical complex
    CustomerGazpromneft- Catalytic Systems, LLC
    General contractorStroyCity, LLC
    Object name, allocationLaboratory and analytical complex, primary production facilities and off-site facilities (OSF)
    Fulfillment periodAugust 2018 – December 2018
    Type of worksDisassembly of building structures, underground utilities and metal structures. Complex of building, assembly and commissioning works
  2. Комплекс строительно-монтажных работ по монтажу металлических конструкций технологических эстакад
    CustomerGazpromneft-ONPZ JSC
    General contractorNIPIGAZ JSC
    Object name, allocationSite for the off-plant facilities construction for the operation of CDU/VDU, DCU and AORC in the territory of the operating plant of Gazpromneft-ONPZ JSC
    Fulfillment periodJuly 2017 – November 2018
    Type of worksComplex of construction and erection works for the installation of metal structures of technological platforms, installation of foundations, piling works, dismantling/installation of water supply and sewerage networks, installation of technological pipelines and cable construction
  3. Оборудование магистральной насосной No2
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationOn-spot loading rack-2 on the pipe welding station-2 of Gazpromneft-ONPZ JSC
    Fulfillment periodJuly 2017 – August 2018
    Type of worksDevelopment of the railroad facilities of the enterprise. Construction of non-public railway tracks for the on-spot loading rack-2 on the pipe welding station-2 of Gazpromneft-ONPZ JSC. Construction of quiescent rail road-track scale at the on-spot loading rack-2 of Gazpromneft-ONPZ JSC (Construction, installation, commissioning works)
  4. Комплекс строительно-монтажных работ
    CustomerGazpromneft-ONPZ JSC
    General contractorGazprom Avtomatizatsiya PJSC
    Object name, allocationCDU/VDU complex located at Gazpromneft-ONPZ JSC, with an address at: 644040, Omsk city, Gubkin Ave., 1, log No. 80-81
    Fulfillment periodJune 2017 – July 2018
    Type of worksConstruction and erection works
  5. Замена резервуара № 779
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationTechnical re-equipping. Renewal of reservoir No. 779 in the depot No. 1131. Unit No. 37/1-4” in the of Gazpromneft-SM LLC OZSM
    Fulfillment periodJune 2017 – December 2017
    Type of worksDismantling, assembly, construction, insulation, chemical protection, electrical installation works, external water and sewerage lines, wastes disposal limits project
  6. Замена резервуаров № 854, 855
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationTechnical re-equipping. Renewal of reservoir No. 854, 855 in the depot No. 1133 TF-3 in the of Gazpromneft-SM LLC OZSM
    Fulfillment periodJune 2017 – December 2017
    Type of works:Dismantling, assembly, construction, insulation, chemical protection, electrical installation works, external water and sewerage lines, control and measuring devices and automatic equipment, process control system, wastes disposal limits project
  7. Trunk pipeline pump station of LODS (liner operating dispatcher station) «Omsk». Building», «Equipment of trunk pipeline pump station No. 2. Replacement of main pump units No. 1, No. 2 and No. 3. Omsk District Oil Pipeline Agency. LODS «Omsk». Retrofitting and upgrading».
    CustomerTransneft-Zapadnaya Sibir JSC
    General contractorStroyCity LLC
    Object name, allocationTrunk pipeline pump station of pipeline remote pumping station “Omsk”. Construction”, “Equipment for trunk pipeline pump station No. 2. Replacement of main pump units No. 1, 2 and 3. Omsk Regional Oil Pipeline Management. Pipeline remote pumping station “Omsk”. Technical re-equipping.
    Omsk city, Kombinatskaya Str., 42
    Fulfillment periodApril 2017 – November 2017
    Type of worksConstruction and installation works (dismantling, installation of pipelines and pumping units) including the construction/dismantling of temporary buildings and structures; tests and diagnostic devices pigging; commissioning work including individual and functional testing.
  8. Treatment unit of regeneration gases of catalytic cracking. (Range of works on demolition/ dismantling of capital facilities and transferal of out-door plumbing system networks).
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationTreatment unit of regeneration gases of catalytic cracking. (Range of works on demolition/ dismantling of capital facilities and transferal of out-door plumbing system networks).
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodMarch 2017 – July 2017
    Type of worksDismantling of equipment and piping with partial saving of equipment and building constructions (potassing pumping house, foundations, compressor house), ferroconcrete fume stack 100 m high element-by-element (with 2 m rings) with the use of diamond carving and lorry crane Liebherr LTM 1500.
  9. “Automated installation of timed pouring No. 1”.
    CustomerGazpromneft-ONPZ JSC
    General contractorOMUS-1 OJSC
    Object name, allocation“Automated installation of timed pouring No. 1”.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodOctober 2016 - August 2017
    Type of worksConstruction of the breast wall device, installation of fire tanks (monolithic bottom slabs, monolithic tank walls), installation of water supply and sewage networks.
  10. Reconstruction of installation 36/1-1 for the purpose of getting softening oils likeTDAE” in OJSC ”Gazpromneft-SM” “OZSM”
    CustomerGazpromneft-SM LLC OZSM
    General contractorStroyCity LLC
    Object name, allocationReconstruction of installation 36/1-1 for the purpose of getting softening oils like IDAE on Gazpromneft-SM OJSC OZSM.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodSeptember 2016 - December 2016
    Type of worksDismantling of existing equipment and buildings, general construction works, mechanical installation works (mantling of technological equipment and piping), electrical works, instrumentation and control equipment, plant floor system, pre-commissioning activities, equipment supply.
  11. “ELOU-AVT complex” within the existing enterprise JSC “Gazpromneft-ONPZ”.
    CustomerGazpromneft-ONPZ JSC
    General contractorOMUS-1 OJSC
    Object name, allocationCDU/VDU complex within the existing enterprise Gazpromneft-ONPZ JSC.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodMay 2016 - March 2017
    Type of worksGroundworks, pileworks, foundation pour, backfill of pit hollows, mantling of water drawdown system.
  12. Technical re-equipping of carbolic acid/acetone production section 101 - 105. OJSC “Omskiy kauchuk”.
    CustomerOmskiy kauchuk PJSC
    General contractorStroyCity LLC
    Object name, allocationTechnical re-equipping of carbolic acid/acetone production section 101 - 105. Omskiy kauchuk PJSC.
    Fulfillment periodMay 2016 - August 2016
    Type of worksDismantling of existing stand, foundations for equipment due to common excavation; dismantling of pump shelter in axles 19-24 AB; structural construction for stand and foundations for equipment; ground injection.
  13. Maintenance of Lenin Street in the lot from Partizanskaya Street to Victory Square (including neighbouring Dzerzhinskiy Garden, garden near Academy Drama Theater and Theater Garden).
    CustomerGazpromneft JSC
    General contractorPetrostroy LLC
    Object name, allocationMaintenance of Lenin Street in the lot from Partizanskaya Street to Victory Square (including neighboring Dzerzhinskiy Garden, garden near Academy Drama Theater and Theater Garden).
    Lenin Str, Omsk.
    Fulfillment periodApril 2016 – May 2016
    Type of worksRange of works on application of monolithic constructions of stair approaches with retaining wall and monolithic constructions of pedestrian under crossing.
  14. Local water unit for solvent deasphalters 36/1-1, 36/1-3, 36/3-4.
    CustomerGazpromneft - SM LLC
    General contractorStroyCity LLC
    Object name, allocationLocal water unit for deasphalting plants 36/1-1, 36/1-3, and 36/3-4.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodOctober 2015 – December 2016
    Type of worksConstruction of pile bases, water supply and sewerage, cooling towers, industrial building, process pipe racks. General construction, electrical installation, construction and installation work. Supply of equipment, commissioning works, installation of ventilation and heating systems, installation of water supply and sewerage networks, process pipelines and equipment, automation.
  15. GPE-6N (Range of building and erection pre-commissioning activities).
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationGPE-6N (Range of building and erection pre-commissioning activities).
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodApril 2015 - February 2016
    Type of worksElectric and structural works, application of ventilation and heating system, WSS networks, industrial pipelines and equipment, automation.
  16. Reconstruction of installation CT 1/1 of section 100/200/300/400.
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationReconstruction of installation CT 1/1 of section 100/200/300/400.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodMarch 2015 - September 2015
    Type of worksPreparatory works, pile works, ground works, application of monolithic instrument room, mantling of steel constructions, decoration works, electrical works, installation of water supply and sewage networks.
  17. Portal viewing platform with ladder descent to the quay of Irtysh river.
    General contractorCC IdealStroy LLC
    Object name, allocationPortal viewing platform with ladder descent to the quay of Irtysh river.
    Chokan Valikhanov Str, Omsk.
    Fulfillment periodJuly 2014
    Type of worksApplication of monolithic ferroconcrete walls, floor slabs, stair flights. Electrical works.
  18. Water unit for installations VAC-4,5.
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationWater unit for installations VAC-4 and 5.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodFebruary 2014 - June 2015
    Type of worksPreparatory works, pile works, ground works, application of concrete and ferroconcrete monolithic constructions, mantling of steel constructions and industrial pipelines, decoration works, electrical works, installation of water supply and sewage networks, instrumentation and control equipment.
  19. Water unit for installations 43/103.
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationWater unit for installations 43/103.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodApril 2014 - December 2015
    Type of worksPreparatory works, pile works, ground works, application of concrete and ferroconcrete monolithic constructions, mantling of steel constructions and industrial pipelines, decoration works, electrical works, installation of water supply and sewage networks, instrumentation and control equipment.
  20. Terminal of gutter, storage and injection into processing of SGC.
    CustomerGazpromneft-ONPZ JSC
    General contractorOMUS-1 OJSC
    Object name, allocationTerminal of gutter, storage and injection into processing of SGC.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodNovember 2013 - December 2014
    Type of worksApplication of piled foundations, monolithic slabs, cable tray systems, WSS, buried tank, retaining wall.
  21. Installation of hydrocracked VGO.
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationInstallation of hydrocracked VGO.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodOctober 2013 - May 2014
    Type of worksDismantling of factory buildings, chimney, process pipe racks, reactor blocks, benches, tank farm, flare.
  22. Section No. 16. Cooler No. 5 on water unit No. 5.
    CustomerGazpromneft-MNPZ OJSC
    General contractorStroyCity LLC
    Object name, allocationSection No. 16. Cooler No. 5 on water unit No. 5.
    Moscow city, Kapotnya
    Fulfillment periodOctober 2013 - April 2014
    Type of worksFabrication and assembly of cooler steel constructions.
  23. Plant office building, site improvements of OJSC “Gazpromneft-ONPZ”.
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationPlant office building, site improvements of Gazpromneft-ONPZ JSC;
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodAugust 2013 - September 2015
    Type of worksDecoration works, electrical works, change of heating radiators and fire alarm system, facade repairing. Building of underground water supply lines and canalization.
  24. Local block of water reuse.
    CustomerOmskiy kauchuk PJSC
    Object name, allocationLocal block of water reuse.
    Omsk city, Gubkin Ave., 30.
    Fulfillment periodAugust 2013 - February 2014
    Type of worksApplication of buried catch pit, piled foundations, laying of WSS networks, application of foundations, flooring.
  25. Objects of social and domestic sphere. Recreation center n.a. D.M. Karbyshev.
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationObjects of social and domestic sphere. Recreation center n.a. D.M. Karbyshev.
    Omsk city, Omsk region, Krasnoyarka village.
    Fulfillment periodMay 2013 - May 2014
    Type of worksReconstruction of canteen building, bedroom building and club.
  26. Track scales on pouring dock tit. 8501 TSB-1 for weighting of four-axle railway wagons.
    CustomerGazpromneft-ONPZ JSC
    General contractorStroyCity LLC
    Object name, allocationTrack scales on pouring dock tit. 8501 TSB-1 for weighting of four-axle railway wagons.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodApril 2013 – October 2013
    Type of worksApplication of piled foundations, cable tray systems, floodlight towers, railway track, and railway scales, beautification, technological process.
  27. Reconstruction of nitrogenous oxygen station and section of air separation on the territory of OJSC “Omskiy kauchuk”.
    CustomerOmskiy kauchuk PJSC
    General contractorStroyCity LLC
    Object name, allocationReconstruction of nitrogenous oxygen station and section of air separation on the territory of Omskiy kauchuk PJSC.
    Omsk city, Gubkin Ave., 30.
    Fulfillment periodDecember 2012 - June 2014
    Type of worksApplication of piled foundations, laying of WSS networks, application of foundations, steelwork erection, assembling of sandwich panels, brickwork of internal partitions, flooring, improvement.
  28. Automatic oil mixture station with a capacity of 70 thous. tons per year.
    CustomerGazpromneft-SM LLC OSZM
    General contractorOMUS-1 OJSC
    Object name, allocationAutomatic oil mixture station with a capacity of 70 thous. tons per year.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodAugust 2012 - October 2013
    Type of worksApplication of piled foundations, laying of WSS networks, application of foundations for tanks, application of concrete dyking of tanks, improvement.
  29. Installation of polypropylene production.
    CustomerTobolsk-Polimer LLC
    General contractorThe Linde Group
    SubcontractorOJSC “OMUS-1”
    Object name, allocationInstallation of polypropylene production. Discharge zone (CA 31, CA 90).
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodMay 2012 – May 2013
    Type of worksInstallation of floors, water supply networks and canalization.
  30. Flyover of bitumen pouring into railway tanks. Installation 19/3.
    CustomerGazpromneft-ONPZ JSC
    General contractorNeftekhimremont LLC
    Object name, allocationFlyover of bitumen pouring into railway tanks. Installation 19/3.
    . Omsk city, Gubkin Ave., 1.
    Fulfillment periodMarch 2012 - July 2013
    Type of worksSite preparation, dismantling of structures, utility lines carryover, building works (groundworks, foundation of floors, water supply networks and canalization).
  31. Integrated plant of gases desulphurization, MEA dip regeneration and getting free sulphur
    CustomerGazpromneft-MNPZ OJSC
    General contractorOMUS-1 OJSC
    Object name, allocationIntegrated plant of gases desulphurization, MEA dip regeneration and getting free sulphur.
    Moscow city, Kapotnya, 2nd sect., bld. 1, block 3.
    Fulfillment periodSeptember 2011 - August 2013
    Type of worksSite preparation, dismantling of structures, utility lines carryover, building works (groundworks, foundation of floors, water supply networks and canalization), improvement.
  32. Monument to Omsk citizens, who greatly contributed to space exploration
    CustomerBranch of Federal State Unitary Enterprise GKN PTs n.a. M.V. Khrunichev PA Polet
    Object name, allocationMonument to Omsk citizens, who greatly contributed to space exploration.
    Omsk city, Kosmicheskiy Ave., 17a.
    Fulfillment periodNovember 2010 - July 2011
    Type of worksGeneral construction and erection works.
  33. Network of naphtha hydrotreater of catalytic cracking and diesel fuels. Off-plot facilities of hydrofining network. Reverse water supply box.
    CustomerGazpromneft-MNPZ OJSC
    General contractorOMUS-1 OJSC, Genenergomontazh LLC
    Object name, allocationComplex of catalytic cracking naphtha and diesel fuels hydrotreater. Reverse water supply box.
    Omsk city, Gubkin Ave., 1.
    Fulfillment periodMarch 2010 - June 2012
    Type of worksPreparation of the construction site, dismantling of structures, removal of utility systems, construction works (excavation, foundation, flooring, construction of water supply and sewerage networks).